WWTP Mühlheim a. d. Ruhr, Germany

Plant:  wwtp Mühlheim a.d. Ruhr, Germany
Contractor:  INVENT Umwelt- und Verfahrenstechnik AG
Type of plant:  Biowaste Fermentation Plant
Capacity:  350 m³/d
Start-up:  2002
Application:  Mixing & Aeration for BOD-Removal,
  Nitrification and Denitrification in a SBR-Plant
  Scope of supply:   Engineering & Design
  2 HYPERCLASSIC®- Mixer/Aerators in a cage
  Blowerstation
  Piping
  iDEC Decanting System
  iSBR SPS-Control System
  Control cabinets
  Start-up